Subdivisions

Elerson Trace Park  
30 lots – Residential
Project Status: 
Construction 70% Complete, paving  and drainage being installed (2/18)
                           Construction 80% Complete, paving  and drainage being installed (3/18)
                           Construction 99% Complete, awaiting final walk-through (4/18)
                           Construction 100% Complete, drainage being finalized (5/18)
                           Construction 100% Complete, drainage being finalized (6/18)
                           Construction 100% Complete, drainage being finalized (7/18)
Developer: Wildwood Development Company I, L.P. 

Engineer: Crannell, Crannel & Martin
Contractor: Wildwood Development Company I, L.P.

The Homestead at Daniel Farm - Phase 1A 
68 lots – Residential
Project Status:  Design Review Complete, Awaiting Pre-Construction Meeting (2/18)
                           Pre-Construction Meeting Scheduled for April 11, 2018 (3/18)
                           Construction started, 5% dirt work complete (4/18)
                           Construction started, 10% dirt work complete (5/18)
                           Construction started, 15% dirt work and utilities being finalized (6/18)
                           Construction started, 20% dirt work and utilities being installed (7/18)
Developer: Wildwood Development Company I, L.P.

Engineer: Dietz Engineering
Contractor: Wildwood Development Company I, L.P.

Summit Parks Phase 2 
72 lots – Residential
Project Status: Design Review (2/18)
                          Design Review Complete Awaiting Pre-Construction Meeting (3/18)
                          Construction started, 5% dirt work complete (4/18)
                          Construction started, 10% dirt work complete (5/18)
                          Construction started, 15% utilities being installed (6/18)
                          Construction started, 20% utilities being installed (7/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: Alluvium Development
 
Hidden Lakes Phase 1 
40 lots – Residential
Project Status:  Design Review (2/18)
                           Design Review (3/18)
                           Design Review (4/18)
                           Design Review (5/18)
                           Design Review (6/18)
                           Design Review (7/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: TBD

Hidden Lakes Phase 2 
31 lots – Residential
Project Status:  Design Review (2/18)
                           Design Review (3/18)
                           Design Review (4/18)
                           Design Review (5/18)
                           Design Review (6/18)
                           Design Review (7/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: TBD

Cole Crossing Estates 
66 lots – Residential
Project Status: Design Review (3/18)
                          Design Review (4/18)
                          Design Review (5/18)
                          Design Review (6/18)
                          Design Review (7/18)
Developer: Harlan Properties

Engineer: Land Design
Contractor: TBD

Trees Farm Phase I 
101 lots – Residential
Project Status: Design Review (3/18)
                          Design Review (4/18)
                          Design Review (5/18)
                          Design Review (6/18)
                          Construction started, dirt work 5% complete (7/18)
Developer: Bloomfield Homes, LLP

Engineer: Engineering Concepts & Design, LLP
Contractor: Precision Management and Construction

 
Parkerville Meadows Phase 3
 
112 lots – Residential
Project Status: Design Review (3/18)
                          Design Review (4/18)
                          Design Review (5/18)
                          Design Review (6/18)
                          Design Review (7/18)
Developer: Kapsen Development Group, LLC

Engineer: Atlas Associates, Inc.
Contractor: TBD